Showing posts with label thru drill. Show all posts
Showing posts with label thru drill. Show all posts

Wednesday, September 26, 2012

Layer Sets (for Blind and Buried Vias) - LAB



Select Tables/Layer Sets > Blind and Buried pull down menu option.


Click on the Thru Drill button and select CAM_DemoNC1-6.D from the Layer List window.


Change the Name entry to LyrSet_1-4.


Click on number “1” from the list with the LMB. 
Add CAM_DemoL1.PHO to the list. 
Do the same for numbers 2, 3, & 4 with CAM_DemoL2, L3 &, L4.PHO respectively.


Click on the Drill Data button with the LMB to pop up the layer list. 
Click on the appropriate layer with the LMB to andselect CAM_DemoNC1-4.D from the Layer List window.


Click the Add button with LMB to create a new layer set name.


Change the Name entry to LyrSet_3-4.


Click on number “1” from the list with the LMB. 
Add CAM_DemoL3.PHO to the list. 
Add CAM_DemoL4.PHO to number 2.


Click on the Drill Data button with the LMB to pop up the layer list. 
Click on the appropriate layer with the LMB to andselect CAM_DemoNC3-4.D from the Layer List window.


Save your work now using File/Save.

Monday, September 24, 2012

Layer Sets (for Blind and Buried Vias) - Video

Watch this video to view a demonstration of the Layer Set operation for Blind and Buried Vias:

Saturday, September 22, 2012

Layer Sets (for Blind and Buried Vias)


When Blind and Buried vias are used in a design CAM350 must be instructed as to the relationships between the Drill Tables and the layers they are associated with. A Layer Set Table is used for this purpose.


The layer set table is accessed from the Tables/Layer Sets > Blind and Buried pull down menu option.

Click on the Thru Drill button to pop up a Layer List window.


Select the layer associated with the final stage (through) drill using the LMB 
(in this case “CAM_DemoNC1-6.D”).



Set up the table for the fist (blind) layer set as follows:
1. Change the Name entry to reflect the layer set (1-4)


2. Click on a number from the list with the LMB. A Layer List window will pop up. 
     Click on a layer from the list that is to be added in the numbered layer position. 
     In the following example we can see that layers 1 and two have already been selected.    
     Adding CAM_DemoL4.PHO will complete the Blind layer set.



3. The drill data for this layer set is added in the same manner as for the thru drill. 
     Click on the Drill Data button with the LMB to pop up the layer list. 
     Click on the appropriate layer with the LMB to select it .



Set up the table for the second (buried) layer set as follows:
1. Change the Name entry to reflect the layer set (3-4)


2. Click on a number from the list with the LMB. A Layer List window will pop up. 
     Click on a layer from the list that is to be added in the numbered layer position. 
     In the following example we can see that layers 3 has already been selected. 
     Adding CAM_DemoL4.PHO will complete the Buried layer set.



3. The drill data for this layer set is added in the same manner as for the thru drill. 
     Click on the Drill Data button with the LMB to pop up the layer list. 
     Click on the appropriate layer with the LMB to select it .


This completes the Layer Set setup.